Answer: 4-6 hours Explanation: I ALWAYS DOUBLE CHECK MY WORK! |
Staging and Design By Che'Le Foster |
Answer: Three full days (24 hours) Explanation: Depending on the clutters, it can take up to 3 days. |
Sheida Rezazadeh,Keller Williams R.E. Services, DRE#0192560 |
Answer: 4-6 hours Explanation: If the home owner has done their 'homework' from our consultation walk through it will take about 4 hours. |
Constructive Consulting, LLC Home Staging & Redesign |
|
ProMatcher |
Answer: Two full days (16 hours) Explanation: There are several variables that affect the amount of time required to fully stage a home of this size. Some of these include: the homeowner's advance work de-cluttering and de-personalizing to prepare the home for staging, the volume of existing furnishings the stager is able to reuse, any purchases or rentals needed, and the time spent designing and executing a custom staging plan. Staging professionals understand time is of the essence when listing a property and we seek to maximize the homeowner's return on investment in the most expeditious way possible! |
Equity Staging & Design LLC |
Answer: One full day (8 hours) Explanation: Depening on condition of home and budget, a 1250 sf home will approximately take one day to accomplish. |
McAtee Staging & Redesign |
Answer: One full day (8 hours) Explanation: In a space with 1,250 sq feet we will probably be staging a kitchen area and kitchen nook, a family room, a bathroom and a bedroom. This will typically take anywhere from 4-8 hours to complete all the packing, sorting and discarding. Additionally we provide shopping services for our clients to compliment the staging process for the finishing touches. This service is billed at $75 per hour. |
Dramatix Decor, Inc. |
|
ProMatcher |
Answer: 4-6 hours Explanation: If the home is clean and clutter-free, and all repairs and small upgrades have been completed, then it only takes a few hours to whip up a look that buyers will love. |
Seneca Home Staging |
Answer: 4-6 hours Explanation: It's best to set aside a full day in order to get the best result |
First Sight Staging |
Answer: One full day (8 hours) Explanation: I think a 1,250 SF occupied space could be completed in one day, but, the time it takes would be based on the condition of the home when you start. |
Decorate and Company |
|
ProMatcher |
Answer: 4-6 hours Explanation: Most homes this size would probably take a 1/2 of day of staging depending on how in depth the project is and how much needs to be done. |
Simply Divine Staging & Design |
Answer: One full day (8 hours) Explanation: As long as the consultation has already taken place and the customer has done all the things I have asked for then a full stage of all rooms and outside space will be somewhere between 6-8 hours. If it is finished sooner then I will charge an hourly rate. |
Perfect Match Homes |
Answer: 4-6 hours Explanation: 4 to 6 hours is perfect when we are using what the owner already has on hand. Obviously if the client needs furniture that would take longer to get and install. In addition if they don't have enough to accessorize, additional time would be needed for shopping |
Dragonfly Home Designs |
|
ProMatcher |
Answer: Three full days (24 hours) Explanation: It takes about 3 days to fully stage a home: 1 day of planning, 1 day of in-home work and 1 day to disassemble. |
New Day Design & Home Staging |
Answer: 4-6 hours Explanation: With homeowner assistance |
Finally Home Staging |
Answer: Not sure Explanation: It may take one or two days, seeing as pretty much the same amount of rooms will need Staging. |
Get it SOLD Home Staging |
|
ProMatcher |
Answer: Not sure Explanation: This completely depends on the individual property. |
Michelle Ford Design |
Answer: 4-6 hours Explanation: I have been staging and designing for 30 years. |
josie mosie and company |
Answer: 4-6 hours Explanation: A home of 1250 sq ft could easily be staged in 4-6 hours providing the owner has done all the work recommended during the initial home staging consultation. |
Suite Effects LLC |
|
ProMatcher |
Answer: 4-6 hours Explanation: A smaller home takes less time to stage but only if the homeowner has removed excess items |
Capital Staging and Redesign |
Answer: 4-6 hours Explanation: Depending on home much homework was already done before the staging day, the amount of time can vary. |
Restyled by Rita |
Answer: 4-6 hours Explanation: When the homeowners have completed all items requested by the home stager to be done before the staging day, it should only take 4-6 hours to stage a 1250 square foot home. However, if items have not been completed, it will take longer and could cause the stager to charge a rescheduling fee. |
Downriver Home Staging LLC |
|
ProMatcher |
Answer: Three full days (24 hours) Explanation: Each family occupied home has different needs so typically I would say three to five days On average. |
Disciplined Design |
Answer: One full day (8 hours) Explanation: timing could be delayed due to other factors, ie. painting, repairs, moving items to storage |
watermelon tree design |
Answer: Two full days (16 hours) Explanation: It's best not to rush staging a home. You want the home to look fabulous and allowing a little extra time will pay off in the long run. If the home is occupied it could take a bit longer. |
Debbie DeMarais |
|
ProMatcher |
Answer: 4-6 hours Explanation: Sometimes more, sometimes less. Depends on each individual home. |
Vine of Design |
Answer: 4-6 hours Explanation: Again, its only the main areas that are being staged. |
Abella Home Staging and Redesign |
Answer: 4-6 hours Explanation: The smaller the home the faster to stage. However depending on the home condition a professional stager may recommend small home improvements to prepare home for a staging day. |
Dec My Home Staging & Redesign |
|
ProMatcher |